Sections

Weather Forecast

Close
Advertisement

Stillwater lift bridge scheduled to reopen July 2; highway 35 also open

Email

The Minnesota Department of Transportation will reopen both directions of traffic on the Stillwater Lift Bridge spanning the St Croix River at 4 p.m. Wednesday, July 2. The lift bridge, which connects Minnesota Highway 36 and Wisconsin Highway 64 has been closed and traffic has been detoured since June 23 due to high water levels. The bridge will resume its normal lift schedule until Friday evening, July 4.

Advertisement

WIS 35 south of Houlton at County E is open to traffic as of July 1. The  new WIS 35 overpass that will travel over the newly-aligned WIS 64 is now complete. 

The Stillwater Lift Bridge will remain in the down position at 10:30 p.m. and 11 p.m. on Friday, July 4. The city of Stillwater, MnDOT and the US Coast Guard and the city of Stillwater, have elected to keep the lift span down to accommodate the anticipated increase in vehicle traffic after Independence Day celebrations. The lift bridge schedule change is valid for that evening only. The 10 p.m. and 11:30 p.m. lifts will still take place. 

Visit http://www.dot.state.mn.us/metro/projects/liftbridge/index.html for more information on the Stillwater Lift Bridge and to view a 2014 Stillwater Lift Bridge opening schedule.

For updated road condition information, call 511 or visit www.511mn.org.

Advertisement
Doug Stohlberg
Doug Stohlberg has been part of the Hudson Star-Observer since 1973 and has been editor since 1987. He worked at the New Richmond News from 1971 to 1973. He holds a bachelors degree in journalism from the University of Minnesota.
(715) 808-8600
Advertisement
Advertisement